BCN 4612 SU2021 Homework #3 Page 1 of 2

BCN4612 Construction Cost Estimating II

Homework #3

Instructions for Homework #3

By the end of this homework, you should have:

i. Estimated the exterior walls
ii. Estimated the interior walls

iii. Estimated the interior wall finishes
iv. Estimated the interior floor finishes

v. Estimated the general conditions
vi. Estimated the equipment

Assessment

i. You will submit your OnScreen Takeoff database and excel files with calculations of
quantities and costs for the required elements.

ii. You will demonstrate proficiency using EXCEL by filling the appropriate tabs with the cost
requested above. Copy the takeoff from OST and paste it in the Excel OST tab. You will

demonstrate your knowledge of estimation by estimating the cost of the items from your

takeoff using RSMeans Online.

iii. You will continue working on the project report with your notes, assumptions, and cost
sources. You should explain your reasonings and rationale of your work. For example, why

you select a certain RSMeans item, how you take off a certain element, etc. This will help you

keep track of your sources and will help me to figure out the grading of your work as I will be

able to see where and how you got your costs.

PART 1 Estimate exterior walls, interior walls and interior wall/floor/ceiling finishes

1.1 Determine the different types of finishes available by looking at wall sections A5-1 and A5-2, A7, and

A8 files.

1.2 Create linear conditions for the interior/exterior walls you need to estimate. Simplify your estimate by

creating only few linear conditions named as the wall sections, and assume they go to the height of the

suspended ceiling. See Page A4.1.

1.3 Create your takeoff for the exterior and interior walls with finishes in drawings A2.2, and A2.3.

1.4 Create your takeoff for the floor/ceiling finishes using the finish schedule in drawing A9.2.

1.5 Estimate the cost for exterior and interior walls, interior wall/floor/ceiling finishes.

PART 2 Estimate the general conditions

2.1 Assume the construction will take 12 months to complete.

2.2 Use the General Conditions template to estimate the General Conditions for this project. You will have

to use your own criteria to determine what is included and how much.

2.3 A jobsite usually has a Superintendent, a Project Manager, a Project Engineer, and a Contract

Administrator. Larger jobsites might have assistants as well.

2.4 Search RSMeans for cost information.

PART 3 Estimate equipment

Florida International University

Moss Department of Construction Management

BCN 4612 SU2021 Homework #3 Page 2 of 2

3.1 Look at the kitchen drawings for a schedule of equipment.

3.2 Create count conditions for the different types of equipment. You can select only 12 types of equipment.

3.3 Use RSMeans costs to find out equipment cost. You can also use Home Depot, or any other source of
cost available.

PART 4 Submit Your Work

Use the link provided on Canvas to submit your:

– OST Takeoff database (.mdb file from your windows/mac computer folders)

– General Estimating template (Estimating Template excel sheet)

– Homework report:
1) This report will briefly describe the steps you did to estimate each of the task and the assumptions

you made in your quantity takeoff and estimation.

2) You should export your takeoff as pdf and append to the end of the report. You can follow this to

export your takeoff: in OST, click File –> Print –> Select Range: Pages with Takeoff –> Print to

PDF.

Instructions for Homework #3
PART 1 Estimate exterior walls, interior walls and interior wall/floor/ceiling finishes
PART 2 Estimate the general conditions
PART 3 Estimate equipment
PART 4 Submit Your Work

Place your order
(550 words)

Approximate price: $22

Calculate the price of your order

550 words
We'll send you the first draft for approval by September 11, 2018 at 10:52 AM
Total price:
$26
The price is based on these factors:
Academic level
Number of pages
Urgency
Basic features
  • Free title page and bibliography
  • Unlimited revisions
  • Plagiarism-free guarantee
  • Money-back guarantee
  • 24/7 support
On-demand options
  • Writer’s samples
  • Part-by-part delivery
  • Overnight delivery
  • Copies of used sources
  • Expert Proofreading
Paper format
  • 275 words per page
  • 12 pt Arial/Times New Roman
  • Double line spacing
  • Any citation style (APA, MLA, Chicago/Turabian, Harvard)

Our guarantees

Delivering a high-quality product at a reasonable price is not enough anymore.
That’s why we have developed 5 beneficial guarantees that will make your experience with our service enjoyable, easy, and safe.

Money-back guarantee

You have to be 100% sure of the quality of your product to give a money-back guarantee. This describes us perfectly. Make sure that this guarantee is totally transparent.

Read more

Zero-plagiarism guarantee

Each paper is composed from scratch, according to your instructions. It is then checked by our plagiarism-detection software. There is no gap where plagiarism could squeeze in.

Read more

Free-revision policy

Thanks to our free revisions, there is no way for you to be unsatisfied. We will work on your paper until you are completely happy with the result.

Read more

Privacy policy

Your email is safe, as we store it according to international data protection rules. Your bank details are secure, as we use only reliable payment systems.

Read more

Fair-cooperation guarantee

By sending us your money, you buy the service we provide. Check out our terms and conditions if you prefer business talks to be laid out in official language.

Read more

Order your essay today and save 30% with the discount code HAPPY