reply for discussion

Learnings: The important aspect from this week learning will be the importance of the project control and the measurments of the project control. Project Controls is a process that encompasses the resources, procedures, and tools for the planning, monitoring, and controlling of all phases of the capital project lifecycle. This includes estimating, cost and schedule management, risk management, change management, earned value progressing, and forecasting.(Shtub, A., & Rosenwein, M. 2017) Importance of Project Control: The lack of awareness by the owners and the contactors, of the importance and strength of the project control tecniques results into overruns and turns projects into near disasters. One failed project can potentially wipe out an entire years’s profit. This fact helps in placing the value of project controls into the right perspective. It is important to realize that project managers will not be able to initiate any retrospective corrective actions. Once a job has been completed, one cannot affect its outcome. As such, in for the project control system to be effective it must be applied in time bases on the correct understanding of the system. Projects are filled with pitfalls and if project professionals do not deal with them effectively, the project will fail in some sense and they may face unmanageable budget overruns and damaging schedule slippages. A robust control system is the only way to assist the team in analyzing possible delays or cost overruns. During the course of the project as the project priorities and the goals change, so should be the measurement techniques of project performance (Dubey, Suchi 2013) With the understanding of its importance, there are no organisations which does not operate without project controls. Project controls types: There are three basic types of control mechanisms and the most important control measures are performance, cost and time. (QS Study) This is the most common kind of control mechanism. A project has inputs and outputs. The outputs can be in the form of milestones that have to be met. Cybernetic controls focus on the outputs. If these milestones or outputs do not measure up to the set standards, then the situation is investigated to see if there is a sufficient cause to change patterns of activity. Go/no-go control takes the form of testing to make sure that certain preconditions are met before a task is undertaken. This type of control can be used for a specific part of the project too. Post-performance controls are applied after the completion of the project or the task, The focus here is not on altering what has already happened but in making sure that good and bad practices are recorded for being of help in future projects. The most apt control technique will be effective for building the house will be cybernatic control. For completion of a new house, certain activities has to be completed like electric wiring, plastering, and painting. If the date of completion of wiring gets delayed, the schedule of activities has to be changed and the pace has to be stepped up to meet the scheduled finish date References Shtub, A., & Rosenwein, M. (2017). Project Management: Processes, Methodologies, and Economics (3rd ed.). Pearson, Chapter 12: PROJECT CONTROL Dubey, Suchi. (2013). Project Control Techniques: Its importance in Project Management activities to minimize Cost and Schedule Over-runs. Journal of Management and Technology. Different types of project control. Qs Study https://qsstudy.com/business-studies/different-typ… Requirements: 100 words Cybernetic Control: Go/No-Go Control: Post Performance Control:

Place your order
(550 words)

Approximate price: $22

Calculate the price of your order

550 words
We'll send you the first draft for approval by September 11, 2018 at 10:52 AM
Total price:
$26
The price is based on these factors:
Academic level
Number of pages
Urgency
Basic features
  • Free title page and bibliography
  • Unlimited revisions
  • Plagiarism-free guarantee
  • Money-back guarantee
  • 24/7 support
On-demand options
  • Writer’s samples
  • Part-by-part delivery
  • Overnight delivery
  • Copies of used sources
  • Expert Proofreading
Paper format
  • 275 words per page
  • 12 pt Arial/Times New Roman
  • Double line spacing
  • Any citation style (APA, MLA, Chicago/Turabian, Harvard)

Our guarantees

Delivering a high-quality product at a reasonable price is not enough anymore.
That’s why we have developed 5 beneficial guarantees that will make your experience with our service enjoyable, easy, and safe.

Money-back guarantee

You have to be 100% sure of the quality of your product to give a money-back guarantee. This describes us perfectly. Make sure that this guarantee is totally transparent.

Read more

Zero-plagiarism guarantee

Each paper is composed from scratch, according to your instructions. It is then checked by our plagiarism-detection software. There is no gap where plagiarism could squeeze in.

Read more

Free-revision policy

Thanks to our free revisions, there is no way for you to be unsatisfied. We will work on your paper until you are completely happy with the result.

Read more

Privacy policy

Your email is safe, as we store it according to international data protection rules. Your bank details are secure, as we use only reliable payment systems.

Read more

Fair-cooperation guarantee

By sending us your money, you buy the service we provide. Check out our terms and conditions if you prefer business talks to be laid out in official language.

Read more

Order your essay today and save 30% with the discount code HAPPY